13 large residential units on average over 1,000 SQFT per unit. The square footage of the building is 14,440 SQFt.- All units have a Washer dryer.- Most units have appliances owned by the owner.- Hydro is paid by Tenant.- Basement is over 8-9 feet in heightand can be used as storage for future tenants with some fixing up.- 6 units were completely redone as there was a fire in the building in 2019.- Most units are updated- A super buildingand great tenants!
13 large residential units on average over 1,000 SQFT per
unit. The square footage of the building is 14,440 SQFt.
- All units have a Washer dryer.
- Most units have appliances owned by the owner.
- Hydro is paid by Tenant.
- Basement is over 8-9 feet in heightand can be used as
storage for future tenantswith some fixing up.
- 6 units were completely redone as there was a fire in the
building in 2019.
- Most units are updated
- There was a small decontamination done in 2021. Phase 1
and phase 2 and confirmationof decontamination available.
- 2.5 years left on CMCH loan to be assumed with balanceof
2.2M at 1.66% for 35 Amortization.
- Main plumbing pipe changed that leads to city in 2022.
A super buildingand great tenants!
BUILDING | |
---|---|
Type | |
Style | Attached |
Dimensions | 24.38x21.95 M |
Lot Size | 535.1 MC |
EXPENSES | |
---|---|
Municipal Taxes (2023) | $ 37440 / year |
School taxes (2023) | $ 2331 / year |
ROOM DETAILS | |||
---|---|---|---|
Room | Dimensions | Level | Flooring |
N/A |
CHARACTERISTICS | |
---|---|
Water supply | Municipality |
Heating energy | Electricity |
Foundation | Poured concrete |
Rental appliances | Water heater |
Siding | Concrete, Brick |
Proximity | Highway, Cegep, Hospital, Park - green area, Elementary school, High school, Public transport, Bicycle path, Daycare centre |
Sewage system | Municipal sewer |
Zoning | Commercial, Residential |
Distinctive features | Environmental study phase 1, Environmental study phase 2 |