BUILDING | |
---|---|
Type | Two or more storey |
Style | Attached |
Dimensions | 8.91x4.85 M |
Lot Size | 806.4 MC |
EXPENSES | |
---|---|
Energy cost | $ 2320 / year |
Municipal Taxes (2023) | $ 2794 / year |
School taxes (2023) | $ 264 / year |
ROOM DETAILS | |||
---|---|---|---|
Room | Dimensions | Level | Flooring |
Hallway | 6.3 x 6.8 P | Ground Floor | Ceramic tiles |
Living room | 7.9 x 15.8 P | Ground Floor | Wood |
Dining room | 11.4 x 7.11 P | Ground Floor | Wood |
Kitchen | 11.6 x 9.11 P | Ground Floor | Ceramic tiles |
Washroom | 4.9 x 4.8 P | Ground Floor | Ceramic tiles |
Bedroom | 9.3 x 12.7 P | 2nd Floor | Wood |
Bathroom | 8.4 x 9.9 P | 2nd Floor | Ceramic tiles |
Primary bedroom | 10.7 x 14.11 P | 2nd Floor | Wood |
Family room | 13.7 x 14.2 P | Basement | Floating floor |
Laundry room | 6.5 x 8.7 P | Basement | Ceramic tiles |
Home office | 7.2 x 17.6 P | Basement | Floating floor |
CHARACTERISTICS | |
---|---|
Landscaping | Fenced |
Cupboard | Other |
Heating system | Space heating baseboards, Electric baseboard units |
Water supply | Municipality |
Heating energy | Electricity |
Equipment available | Central vacuum cleaner system installation, Alarm system, Wall-mounted heat pump |
Windows | PVC |
Foundation | Poured concrete |
Siding | Aluminum, Brick |
Distinctive features | Wooded lot: hardwood trees, Cul-de-sac |
Proximity | Other, Highway, Park - green area, Elementary school, High school, Public transport, Daycare centre |
Bathroom / Washroom | Seperate shower |
Basement | 6 feet and over, Finished basement |
Parking | Outdoor |
Sewage system | Municipal sewer |
Window type | Sliding, Crank handle |
Roofing | Asphalt shingles |
Zoning | Residential |
Driveway | Asphalt |